October 7th 2017 - Repair on 2 washouts

There was a great turnout for day, a lot of folks came out to volunteer their time to make the canyon a little safer for the public. Two washouts were repaired and a water diversion damn was created.  After the work was done, we went off for a little playing in the rocks.


May 8, 2016  Initial inspection of trails 10 and 3554

A small group (6) spend roughly 6 hours running trails 10 and 3554 for an initial inspection, to evaluate their condition. The group relocated and added a few signs, performed some light clearing of brush and entered GPS documentation.


Logo Design by FlamingText.com
Logo Design by FlamingText.com

Our club is very proud to announce we have adopted the Bulldog Canyon OHV area